Energy Prices Change!
Levy of Fuel Surcharge Adjustments (FSA)

DHBVN, vide its Sales Circular no. D-33/2015 dated 24th September, 2015 has issued instructions regarding FSA to be levied @ 3 Paise per unit instead of 5 paise per unit w.e.f. 01.07.2015
Hence, the total FSA to be levied w.e.f. 01.07.2015 is as under:

S.No. Category of Consumers FSA Currently levied Addl. FSA levied w.e.f. 01.07.2015 Total FSA leviablew w.e.f. 01.07.2015
1. HT Industry (above 50 KW) Rs. 1.61 0.03 Paise Rs. 1.64
  Arc Furnance/ Steel Rolling mills Rs. 1.61 0.03 Paise Rs. 1.64
2. LT Industry upto 50 KW      
3. Up to 10 KW Rs. 1.58 0.03 Paise Rs. 1.61
4. 10 KW to 20 KW Rs. 1.58 0.03 Paise Rs. 1.61
5. 20 KW to 50 KW Rs. 1.66 0.03 Paise Rs. 1.69
6. Existing consumers above 50 KW & upto 70 KW (LT) Rs. 1.69 0.03 Paise Rs. 1.72

 
Members are requested to kindly make note of the above and guide themselves accordingly for refund claims, wherever due.

________________________________________________
 
DHBVNL Sales Circular No.34/2015
 
Subject :  Clarification regarding replacement of stolen T/F -Electricity Supply Code (D-17/2014 ) .
 
In case of LT Connection (other than domestic supply connection) where the T/F has been installed by the Consumer / Nigam and is exclusively used for supply /the transformer if and when required to be replaced / repaired shall be done as under :-               
  1. In case of damage of DT within warranty period , the T/F shall be replaced by the consumer (in case supplied by the consumer under self execution scheme ) / supplier (in case provided by Nigam ) . In case of damage of DT beyond warranty period due to internal faults. the same should be replaced by the Nigam free of cost .
  2. In case of theft of the distribution T/F within the warranty period, the same shall be replced by sharing equally the cost between the Consumer and the Nigam.
  3. In case of theft of distribution T/F beyond the warranty period, the same shall be replaced by getting 20 % of the cost of DT deposited from the Consumer.
  4. The cost @ 50% and @ 20% (as applicable ) to be deposited from the consumer shal be determined based on the P&D rates applicable on the date of happening of the Event.